Ayudamos a los integradores y usuarios finales a implementar el hardware adecuado para el entorno adecuado, y lo respaldamos de principio a fin.
Prevención de pérdidas, seguridad del personal y conocimiento operativo en minoristas de uno o varios sitios.
Grabación 24/7 y protección perimetral para huellas grandes y de alto valor.
Campus seguros con supervisión centralizada y basada en roles.
Terminales inteligentes y control de accesos para lugares de trabajo modernos.
Infraestructura escalable para implementaciones en ciudades seguras y espacios públicos.
Cobertura discreta y fiable para hoteles, locales y restaurantes.
Díganos el tipo y la escala de su sitio: le recomendaremos una lista de materiales de hardware.
Solicitar una recomendación Ver despliegues típicosA surveillance project is more than a box of cameras. Here is how we turn a site requirement into a deployment that works on day one and stays supportable for years.
We start with your environment, not a product catalogue. Tell us the site type, coverage area, lighting, network conditions and retention target, and we map them to a hardware approach.
You receive a line-by-line BOM covering cameras, recorders, storage, cabling and accessories, with quantities sized to your channel count and recording policy.
Mixed-site projects often combine legacy gear with new hardware. We check protocol, format and recorder compatibility before shipment so components work together on arrival.
Consolidated packing, export documents and clear labeling keep customs and receiving simple. After delivery we stay available for configuration guidance and spare parts.
A common mistake is to size storage only by camera count. Retention days, bitrate, compression and the number of simultaneous streams all change the required capacity, so we calculate from recording policy rather than channel count alone. Another is to mix signal formats without checking recorder inputs. If you already own part of the system, send us those model numbers and we will confirm what can be reused and what needs to change. This avoids over-ordering and prevents compatibility surprises at commissioning. For multi-site rollouts we can stage shipments by phase and keep a spare-parts list so a single failed unit does not stall an entire installation.
Whether you are a distributor building stock, an integrators' bid, or an end-user rolling out across multiple sites, the same discipline applies: define the requirement, size the hardware correctly, verify compatibility, and support it after installation. Send your site drawing, channel count and target retention on WhatsApp or through the contact form, and we will return a scoped recommendation with an FOB indication within one business day. Where a third-party brand is specified, Equals supplies and integrates it; we do not present ourselves as the manufacturer or an authorized agent of that brand.